Week 13 : Three down, Venice a go!
It's officially completed! 3 months and a week later, we finally have a home. We are set to settle on the 27th. The house has officially completed construction! Woot woot! All blemishes were fixed and our creaky floor was fixed in the guest room. But, we noticed a dip in our morning room floor that we are hoping will get fixed before we close. What was completed this week: Kitchen Cabinets were leveled, replaced and repaired. Kitchen cabinet trim (kick plates) were placed. Sidewalk poured Steps from garage to mudroom was installed Steps to front door was poured as well Backyard door was leveled Pics: Outside: Our stoop: Through the front door: Looking outside: Our finished kitchen: Rob doing his pose like the first picture we took when we broke ground: Part of the Living Room: Someone snapped me peeking through the window: Our sidewalk and mailbox. :( He will be fixed: